Site icon StockBytes PH Knowledge bits for the Philippine Market.

ATN Holdings joins the initial part of the commuter railway venture

atn holdings

Listed company ATN Holdings, Inc. (ATN) stated it’s collaborating within the development of the P54-billion phase 1 of the North-South Commuter Railway (NSCR) venture. The listed holding firm added it’s “actively engaged” in discussions for rock supply developments with numerous private and non-private proponents dedicated to large-scale infrastructure growth within the nation.

“Last September, ATN commenced the supply of rock aggregates to the project for use as construction supplies,” ATN stated in an e-mail on weekend. ATN operates rock-extraction services in Rodriguez, Rizal. It additionally has pursuits in actual property, renewable power, and know-how.

“Beforehand, ATN disclosed indicated rock reserves of around 65 million tons, equal to an estimated accreted worth of P65 billion. Up to now, it has a present stock of at the very least 1 million tons of high-grade rock aggregates for future deployment,” the corporate added.

“We’re thrilled to be in a place to seize multiyear persevering with alternatives within the bullish infrastructure sector given the huge dimension of our strategic stockpile and high-quality rock deposits,” ATN Holdings Inc, Chief Government Officer Arsenio T. Ng stated.

The Philippine Nationwide Railways (PNR) Clark Section 1 (Tutuban-Malolos) venture goals to attach Tutuban, Manila to Malolos. As soon as accomplished, the 38-kilometer railway challenge is predicted to cut back journey time from about 1 hour and 30 minutes to 35 minutes.

The venture is now 40.48% full. It’s anticipated to be partially operable by December subsequent yr, according to the Transportation division.

“In 2019, the primary part of the [NSCR] challenge was awarded to the three-way partnership of quadruple A-rated contractor D.M. Consunji and Japan’s Taisei Company,” ATN Holdings Inc.

The Transportation division additionally plans to start out the development of the PNR Clark Section 2 rail line connecting Malolos to Clark throughout the fourth quarter.

The businesses that may work on the challenge are Hyundai Engineering & Building Co., Ltd., Dong-ah Geological Engineering Co. Ltd., Megawide Building Corp., Acciona Building Philippines, Inc., Daelim Industrial Co., Ltd., Italian-Thai Growth Public Co. Ltd., EEI Corp., and POSCO Engineering and Building Co., Ltd. 

Souce: BusinessWorld ; PinoyDesk


*The owner of StockBytes PH is a licensed stockbroker, contact us if you want to open a broker-assisted or online account. Contact us/Services.

Ready to start your financial journey? email us at stockbytesph@gmail.com or follow our social media account and join our groups, Cheers!

Exit mobile version